THE BEST SIDE OF ATS SOCOMEC

The best Side of ATS Socomec

The best Side of ATS Socomec

Blog Article

They have a completely programmable integrated an built-in ATS controller, enabling computerized transfer amongst two resources in major/genset or mains/mains purposes.

Get started with A B C D E File G H I J K L M N O P Q R S T U V W X Y Z VIETNAM Telephone book - VIETNAM Enterprise DIRECTORY

Quickly commissioning On Preliminary energy up, the ATyS C55’s clever wizard will information the operator from the commissioning process.

ATyS t and g switches offer you considerable time saving throughout commissioning (procedure requires two to three minutes). Owing to the design that allows commissioning as a result of just two potentiometers (four on the ATyS g) and 4 DIP switches, a scrrewdriver is all of that is required to configure the parameters.

Awesome Grid, storage for integrating renewable Electrical power and islanding, a demonstrated actuality Solenbat optimises the Lively Strength efficiency of properties Stem, Vitality storage methods for minimized electrical power billing Paradise, a smart community for the local community Innovation Shut

=> Bộ ATS sẽ có chức năng sử dụng tự đồng và cả chức năng sử dụng bằng tay

The self-run from sensing ATSE with door mounted controller and RS485 integrated conversation, dedicated to quite possibly the most unfold mains/mains and mains/genset applications

Built-in auxiliary contacts As A part of the products monitoring function, the ATyS r empower the transmission of information regarding their posture. This is feasible due to the common integration of the auxiliary Make contact with for every place.

Stability and trustworthiness ATyS p have equally electrical and mechanical interlocks for optimum security. The 0 posture presents electrical basic safety disconnection and makes it possible for TSE lockout as per IEC60947-three.

Transfer Switch Selector Find out the switching Alternative to improve your set up The net configurator that will let you find the very best switching products in your installations from 16A to 6300A.

FR Source library has all the things you will need to assist you to pick read more the ideal power Remedy.

Selling prices incorporates fastened fares, taxes & gratuity without hidden charges. You are going to acquire affirmation of your respective scheduling by using email confirming your trip particulars.

Uncomplicated Config Method program Configure your Socomec measuring and load breaking devices Method tactic to get a more quickly, more reputable and more versatile configuration of your respective power monitoring technique

Trip operate ATyS p M incorporates a operate for returning towards the 0 position in the event of the lack of the two electrical power source resources (tripping). This shields the load from challenges because of supply instability.

Report this page